First Article Inspection for Cable Assemblies: Drawing, Sample, Report
Follow us now:
- Quick Answer
- What Is a First Article Inspection for a Cable Assembly?
- What the FAI Is Not
- Why Bother With an FAI on a Custom Assembly?
- The Three Inputs: Drawing, Sample and Report
- What Belongs in the Drawing Package?
- Revision Control and Ballooning
- Critical, Major and Minor Characteristics
- What Should the Sample Actually Demonstrate?
- How Many Units and From Which Run?
- Which Characteristics Get Measured and How?
- How Do You Verify Crimp Quality?
- How Is Sealing and Strain Relief Checked?
- Electrical Verification: Continuity, Millivolt Drop and HiPot
- What Do Most First Reports Get Wrong?
- When Must an FAI Be Repeated?
- Who Performs the Inspection and Who Signs It?
- A Buyer's Checklist Before Signing the FAI
- How WEIPU Supports First Article Inspections
- Conclusion
- Related products and further reading
- Frequently Asked Questions
Quick Answer
A first article inspection, usually shortened to FAI, is the full verification of one production-representative cable assembly against its released drawing before series manufacturing starts. The package has three parts: a drawing with ballooned characteristics, a physical sample built on production tooling, and a report that records a measured result for every ballooned number.
For a custom cable assembly, the FAI is where most quality risk is retired. Crimp dimensions, contact resistance, sealing and strain relief either get proven here or get discovered as field failures later. This guide explains what belongs in each part of the package, which tests matter for crimped and sealed circular assemblies, and what buyers should check before signing the report.
What Is a First Article Inspection for a Cable Assembly?
A first article inspection is a documented, one-time verification that a supplier's process can produce a part matching the drawing. Aerospace programmes formalise it under AS9102, automotive programmes fold it into PPAP under IATF 16949, and general industrial work usually borrows both formats under an ISO 9001 quality system.
A cable assembly adds complexity that a machined bracket does not have. The part combines a purchased connector, crimped or soldered contacts, cut and stripped conductors, overmoulds or backshells, and often a cable gland or braid. Each step adds a characteristic, and every characteristic on the drawing should reappear as a measured row in the report.
What the FAI Is Not
An FAI is not a type test. It does not certify a product family, and it does not replace the qualification tests a connector itself passed — salt spray, flammability, mating durability. It proves one thing only: that this process, with this tooling and this drawing revision, produced this part correctly. Terminations are judged the same way whether the design uses crimp, screw or cage-clamp contact blocks, as this comparison of screw, crimp and cage-clamp connector inserts explains.
Why Bother With an FAI on a Custom Assembly?
Most cable assembly defects are invisible at goods-in. A crimp that is 0.1 mm out of height still looks assembled. A gland matched to the wrong cable outer diameter seals on the bench and weeps in the field. These are exactly the defects that surface after installation, when rework is expensive and responsibility is contested.
The FAI moves that discovery into a controlled moment. Correction cost rises by roughly an order of magnitude at each stage — drawing, production, installation, field — so catching a wrong stripping length at inspection costs minutes, while the same error found on 500 installed units costs weeks. The inspection is inexpensive insurance bought with engineering time rather than money.
The Three Inputs: Drawing, Sample and Report
- Drawing: the released, revision-controlled document, with every measurable characteristic ballooned and numbered.
- Sample: complete assemblies built with production tools, production operators and released materials — not laboratory samples.
- Report: the characteristic-by-characteristic record that ties each balloon number to a measurement, a test method and a pass or fail result.
If any of the three is missing, the inspection has not happened. A sample without a ballooned drawing cannot be judged; a report without a traceable sample proves nothing about future production.
What Belongs in the Drawing Package?
The drawing is the contract the FAI measures against. It should carry a revision letter, dated change notes, and a full specification of conductors, contacts, plating, cable type, length tolerance and marking. Anything left to the assembler's judgement will eventually be judged differently than the designer intended.
Revision Control and Ballooning
Ballooning means a numbered reference to every characteristic on the drawing, so the report can cite "balloon 14" instead of a vague description. Typical balloons on a circular assembly cover overall length, stripping length, crimp height, contact seating depth, shell keyway orientation, gland torque and label content. When the drawing revises, the balloon set revises with it, and the previous report becomes historical evidence only.
Critical, Major and Minor Characteristics
Not every dimension deserves the same scrutiny. Many programmes classify characteristics as critical, major or minor. A critical characteristic is a dimension whose failure could cause a safety or function loss — a power contact crimp on a 10 A circuit, for example. Critical items usually demand 100% measurement on the article and statistical control in series production, while minor items may be verified on the first piece plus periodic audit.
What Should the Sample Actually Demonstrate?
The sample must come from the production line, built by production staff with the released crimping tools, stripping settings and materials. A hand-built sample proves the design; only a production-built sample proves the process. In-line circular connectors such as the IP67 SF1211 in-line cable connectors are typical FAI subjects, because their crimp contacts carry both power and signal circuits in one sealed body.

How Many Units and From Which Run?
Common practice asks for one to three complete assemblies, sometimes plus a destruct sample for pull testing. Where one connector carries several contact sizes, the destruct units should include every wire gauge used, because pull force differs by strand size. The sample run should also be a short batch rather than three pieces on a bench, so the result says something about batch 10,000 and not only about the first three.
Which Characteristics Get Measured and How?
The table below maps the characteristics that dominate cable assembly FAIs to the usual measurement method and the evidence the report should carry.
| Characteristic | Method | Evidence in the report | Typical failure mode |
|---|---|---|---|
| Overall and strip lengths | Calliper or length fixture | Measured value per balloon, tolerance stated | Length tolerance missing from the drawing |
| Crimp height | Micrometer or optical comparator | Reading in 0.01 mm steps against the crimp window | Wrong anvil size or worn tooling |
| Pull-off force | Tensile tester, destruct sample | Newton values per wire size, break mode noted | Strands outside the barrel or nicked by stripping |
| Contact resistance | Four-wire millivolt drop | mΩ value per contact against the contact specification | Under-crimp raising resistance and heat |
| Continuity and insulation | Continuity tester, HiPot | Pass/fail per pin map at the stated test voltage | Miswired pin map or damaged insulation |
| Sealing and gland fit | Gauge check, immersion where specified | Cable OD versus gland range, leak result | Gland range mismatched to the cable |
How Do You Verify Crimp Quality?
Crimping is where custom assemblies differ most from catalogue parts. Two checks dominate. First, crimp height: the compressed barrel is measured and must fall inside the window the contact maker publishes for the strand size — a window often only a few tenths of a millimetre wide, read in 0.01 mm steps. Second, pull-off force: IEC 60352-2 defines the test method for solderless crimped connections, and typical acceptance values for small industrial contacts run from tens of newtons on 0.14 mm² strands to hundreds of newtons on 2.5 mm² cross-sections.
Third, cross-section or peel-back inspection on the destruct sample confirms that strands filled the barrel and that stripping did not nick them.

The contact specification sheet belongs in the evidence chain. A 10 A brass crimp contact with gold plating and a 1.5 mm contact diameter, for example, typically lists a 2.5 mΩ contact resistance target and an 8 mm stripping length, together with matching crimping-tool and removal-tool part numbers. The report should reference that sheet by revision, then place the measured crimp height and pull force beside it. A hydraulic crimping tool with calibrated dies belongs in the production cell, and its calibration certificate should be traceable from the report.

How Is Sealing and Strain Relief Checked?
For IP67 assemblies, the report must show that sealing hardware matches the actual cable. A gland's clamping range is printed in millimetres; a cable at the bottom of the range still seals, but a cable below the range relies on friction alone. Where the drawing calls out ingress protection, the FAI can include an immersion check on a mated sample — 1 m head for 30 min is the classic IP67 condition.
A bend test at the gland confirms that strain relief loads the conductor and not the solder joint. Gland selection is its own discipline, covered in this guide to nickel-plated stainless steel cable glands and their metric thread options.

Electrical Verification: Continuity, Millivolt Drop and HiPot
Every assembly gets a 100% continuity and miswire check against the pin map, even in series production. The FAI adds the deeper tests: a four-wire millivolt drop measurement across mated contacts near rated current, and a dielectric withstand check between adjacent circuits where the drawing specifies one. Signal and power circuits inside one shell behave differently, which is why hybrid connectors that carry power, signal and data in one connection are usually inspected circuit-group by circuit-group. Measurements taken around 23 °C ambient keep readings comparable across labs.
What Do Most First Reports Get Wrong?
- Missing revision references: the report cites balloon numbers that no longer exist on the current drawing revision.
- Untested wire sizes: pull force proven on one strand size while the assembly uses three.
- Lab-built samples: a bench-built article that production tooling could never reproduce.
- Vague methods: "visually OK" recorded where a crimp height reading in 0.01 mm steps was required.
- Lost traceability: no link between the destruct sample, its serial number and the measured values.
- Ignored sub-suppliers: overmoulds and backshells accepted without their own incoming records.
When Must an FAI Be Repeated?
An FAI is valid for one process state. Repeat the inspection when the drawing revises, when crimping tooling or the wire supplier changes, when a connector or contact part number is substituted, or when production has been dormant long enough that process memory has faded — two years is a common rule in aerospace programmes under AS9102. Routine tooling maintenance does not trigger a full repeat, but a first-off check after a major die replacement is cheap and sensible. The qualification route for a substitute supplier follows the same evidence logic, and is set out in how to qualify a second connector supplier.
Who Performs the Inspection and Who Signs It?
In practice the supplier's quality engineer runs the measurements and signs the report first. The buyer's engineer countersigns after reviewing it, or witnesses selected tests at the factory. Whoever executes the work, the report should name the operator, the equipment and its calibration status for every measurement, because an untraceable number is only a claim. Choosing which factory to inspect is the earlier decision; this ten-point connector factory audit checklist covers the evidence to request before the first article is built.
- Supplier quality engineer: runs the measurements and signs the report first.
- Buyer's engineer: reviews the package, countersigns, or witnesses tests at the factory.
- Third-party laboratory: provides tensile, HiPot or immersion results with neutral numbers.
- Production supervisor: confirms the sample was built with released tooling and materials.
Third-party labs appear when the buyer lacks tensile or HiPot equipment, or when both parties want neutral numbers for a disputed characteristic. FAI is one milestone inside the broader discipline of matching connector design to application requirements, not a substitute for it.
A Buyer's Checklist Before Signing the FAI
- Confirm the report references the current drawing revision and that every balloon has a result, not a blank.
- Check that critical characteristics show measured numbers with units, not pass/fail words.
- Ask which units were production-built, and request the serial numbers of the destruct samples.
- Verify crimp height windows and pull-force values against the contact maker's specification sheet.
- Confirm the immersion or equivalent sealing evidence where the drawing calls for IP67 or IP68.
- Agree in writing what triggers a re-run: drawing revision, tooling change, supplier change or dormancy.
How WEIPU Supports First Article Inspections
WEIPU, a circular and industrial connector manufacturer established in 1996, supplies the contact families and accessories that custom assemblies are built on. The range includes crimp contacts with published crimp windows and tool pairings, IP67 circular series such as SF and SP, cable glands in metric thread sizes, and single-ended SF1221 cordsets for connecting field devices, sensors and control systems.
For an FAI, the useful part of that offering is documentation. Contact specification sheets with stripping lengths and crimp-tool part numbers give the inspection team fixed windows to measure against, instead of opinions. The same documentation supports the longer-term reliability picture described in this piece on how material choice affects connector reliability, and it feeds root-cause work when the common causes of industrial connector failure in harsh environments appear despite a passed FAI.
Whether a specific contact or cordset is suitable for a given inspection depends on the drawing's conductor range, sealing callouts and marking requirements. Verify the contact part number, plating and current rating against the current datasheet before the inspection, and request the crimp specification and tooling documents with the sample. Customers evaluating assemblies built on WEIPU contacts may also want the supplier's incoming inspection records for the contacts themselves, so the report sits on an unbroken evidence chain from contact to finished harness. In effect, the FAI report is a birth certificate for the process.
Conclusion
A first article inspection is a simple discipline: freeze the drawing, build a production sample, measure every ballooned characteristic and record the numbers. The expensive failures — under-crimped power contacts, mismatched glands, miswired pin maps — are all catchable at that moment.
Treat the report as the process's birth certificate, and keep its trigger conditions in the purchase contract. Revisit it whenever the process changes, and series production starts on evidence rather than optimism. The same audit trail then stays intact for every batch that follows, which is what separates a documented supplier from a hopeful one.
Frequently Asked Questions
What is a first article inspection for a cable assembly?
It is a documented, one-time verification that one production-built cable assembly matches its released drawing in every ballooned characteristic. The package combines the ballooned drawing, the physical sample and a report showing a measured result for each item. It proves the process, not the design, and it precedes series manufacturing rather than replacing ongoing inspection.
How many units are needed for a cable assembly FAI?
Common practice uses one to three complete assemblies plus destruct samples for pull testing. When a connector carries several contact sizes, destruct units should cover every wire gauge in the design, because pull force differs by strand size. The sample should be built as a short production run so the result reflects the process, not a bench-built exception.
What is the difference between an FAI and PPAP?
An FAI is the inspection itself: verify one production article against the drawing and record the results. PPAP, used in automotive programmes under IATF 16949, is a wider submission that contains the FAI-style dimensional results plus process capability studies, control plans and sign-off evidence. Aerospace AS9102 defines its own FAI forms that PPAP-style packages can resemble.
Which tests prove crimp quality in an FAI?
Three checks dominate: crimp height measured in 0.01 mm steps against the contact maker's published window, pull-off force measured on destruct samples per IEC 60352-2, and cross-section or peel-back inspection confirming the strands filled the barrel without stripping damage. Contact resistance by four-wire millivolt drop adds evidence that the crimp conducts as the specification sheet targets.
When does a cable assembly FAI need to be repeated?
Repeat it when the drawing revises, when crimping tooling or the wire supplier changes, when a connector or contact part number is substituted, or after long production dormancy — two years is a common rule under AS9102. Routine maintenance does not trigger a full repeat, but a first-off check after major die replacement is inexpensive and wise.
Who performs the FAI and who approves it?
The supplier's quality engineer normally measures and signs first; the buyer's engineer countersigns or witnesses selected tests. Third-party laboratories appear when tensile, HiPot or immersion equipment is unavailable in-house. In every case the report should name the operator, the equipment and its calibration status for each measurement, because untraceable numbers are only claims.
Top Circular Connector Manufacturers: Complete Buyer Guide 2026
Application-Based Industrial Connector Selection: A Practical Decision Matrix
First Article Inspection for Cable Assemblies: Drawing, Sample, Report
The Ultimate Guide to Heavy Duty Waterproof Electrical Connectors: Selection, Ratings, and Pro Tips for 2026
Contacts
Sofia
WhatsApp/Phone
Weipu WF Series Industrial Threaded Connectors with IP67 Protection
WEIPU WF Series Industrial Threaded Connectors offer robust IP67 protection, ensuring reliable performance in harsh environments. Designed for secure, waterproof connections, these IP67 connectors are ideal for industrial applications requiring durability and stability. Trust WEIPU for quality and safety.
16A 3PIN Panel mount socket TYP5101-IP44
WEIPU WY-TE Series Waterproof Electrical Plug
With metal clamping-nut IP67, Threaded, Zinc alloy with chrome plating, PPS
WEIPU WY-TE IP67 circular connectors are waterproof electrical plugs with metal clamping-nut, which are durable, safe and easy to assemble with your all devices.With the metal clamping-nut and threaded design, these waterproof electrical plugs ensure high security and super stable connection. It’s an ideal waterproof connector for your applications.
SF610B/P SF610B/S Cable connector IP67
Mate with SF611B, SF612B, SF615B
Get in Touch
Request Related Resources about Industrial Connections & Solutions